50MW Coal-Fired Power Plant Boiler Project: Efficient Supply and Installation Solutions
[50MW Coal-Fired Power Plant Boiler ]
Taishan Group Shines at Kenya Boiler Exhibition
At the Kenya Boiler Exhibition, Taishan Group engaged in detailed discussions with industry experts and project stakeholders about the 50MW coal-fired power plant boiler project. The conversation focused on equipment supply, installation strategies, and the overall project timeline, laying a solid foundation for future collaboration.
Project Highlights: Synchronizing Supply and Installation
Delivery Schedule and Phased Shipment
- Each boiler has a delivery lead time of approximately 9 months. The first shipment, including steel structures, will be delivered within 5-6 months after contract signing to allow early-stage installation.
- Core components, such as pressure parts, will follow in subsequent shipments to ensure seamless integration with on-site construction.
Equipment Scope and Budget
- The complete boiler island solution includes boiler steel structures, ID fans, FD fans, and all essential accessories, with an estimated budget of $15 million (excluding turbine generator units).
- Tailored supply packages and detailed installation equipment lists are available based on client requirements.
Installation Timeline and Continuous Workflow
- The project is expected to take 24 months from contract signing to completion, covering steel structure installation, core component commissioning, and system integration.
- A continuous construction workflow will ensure timely delivery, with the possibility of partial system operation within 16 months.
Comprehensive Support: One-Stop Service from Equipment to Installation
Taishan Group offers not only high-quality boiler equipment but also assists clients in sourcing steel structures and installation machinery. Specialized lifting equipment and technical support can be provided to meet on-site requirements. Additionally, the company is committed to recommending trusted turbine suppliers to optimize the overall power plant solution.
Future Prospects: Driving Success in Power Projects Together
Committed to “Efficiency, Reliability, and Innovation,” Taishan Group delivers customized industrial boiler solutions to global clients. Through this engagement at the Kenya Boiler Exhibition, the company showcased its expertise in coal-fired power plant projects and strengthened its brand presence in the African energy market. Moving forward, Taishan Group will continue to refine its products and services, contributing to the success of power projects worldwide.